As part of the Tweneboa, Enyera and Ntomme (TEN) Project, Jonmoore was  contracted for the transport of offshore floating hoses from the Takoradi Air Force Base to the Takoradi Port.

Our 120T Crane was positioned at the Takoradi Port and this was used for the offloading and installation of these extremely fragile hoses.

The offshore installation phase of the TEN project was also very successfully executed to perfection.