A 400-ton girder crane equipped with an 8-meter ramp – the only and largest lifting equipment in the country has been fully utilized for the construction of submarine riders for the Jubilee Field oil and gas project at Ghana.
These units were approximately 36 meters long and 48 tons in weight and 40 pieces in total were manufactured over a period of 9 months. The pieces were loaded onto a heavy transport ship to be placed at the bottom of the sea at Jubilee Field’s offshore oilfield.
Other heavy lifting areas in which Jonmoore International was involved included: the installation of the 75tons ball mill at the mine site called Ayanfuri in the central region of Ghana, and the lifting and installation of shipping vessels. On-shore gas processing gas from Ghana plants in Atuabo, Western Region.